LAST YEAR PROJECTS

 

 

OTE (Greek PTT)
  • Deinstallation, Packing & Transportation of MW Radio Systems in Greek territory

 

Cosmote (Ericsson + Cosm-one)
  • I&C of PtPRadio Systems (Nokia, ALU, Intracom, Ericsson)
  • Installation & Commissioning of Nokia & Ericsson BTS/RBS
  • 1st & 2nd Level Support Services for Radio Systems (Nokia, ALU, Intracom, Ericsson) & Base Stations
  • Infrastructure works in Base Stations (Rooftop & Greenfield sites (Electromechanical, Metallic Constructions, Electrical, Data Cabling etc.)
 
 
 
Huawei
  • Cosmote: Installation of Data Center FEMTO Project.
  • DT (OTE/COSMOTE): NEW & SWAP, I&C & Integration of Hybrid MW radio systems (IP RAN Project).
  • WIND: SWAP, I&C & Integration of Hybrid MW radio systems (Network  Modernization).
  • Vodafone Greece: SWAP, I&C & Integration of BTS & LTE (VF SRAN).
  • WIND: LTE 4G, I&C & Integration of 4G LTEs 100 sites in Attiki.
  • VICTUS: Sharing Project BTS 2G/3G/4G LTE & MW Links in Greece.
  • OTE / COSMOTE: Packet Optical Transport Platform technology equipment installation, commissioning, and acceptance
  • VODAFONE,: IP/MPLS project OSN installation, commissioning, and acceptance.
  • WIND,: IP/MPLS project OSN installation, commissioning, and acceptance.
 
Hellenic Defence Industry
  • OTE: I&C of PtPSIAE Radio PtP
  • HELLENIC ARMY: Infrastructure, Installation & Alignment of  Antennas (diam.3m)
 
 Intracom Telecom
  • Vodafone & Karre:
    Installation of WiBas Stations