|
OTE (Greek PTT)
-
Deinstallation, Packing & Transportation of MW Radio Systems in Greek territory
Cosmote (Ericsson + Cosm-one)
-
I&C of PtPRadio Systems (Nokia, ALU, Intracom, Ericsson)
-
Installation & Commissioning of Nokia & Ericsson BTS/RBS
-
1st & 2nd Level Support Services for Radio Systems (Nokia, ALU, Intracom, Ericsson) & Base Stations
-
Infrastructure works in Base Stations (Rooftop & Greenfield sites (Electromechanical, Metallic Constructions, Electrical, Data Cabling etc.)
|
|
Huawei
-
Cosmote: Installation of Data Center FEMTO Project.
-
DT (OTE/COSMOTE): NEW & SWAP, I&C & Integration of Hybrid MW radio systems (IP RAN Project).
-
WIND: SWAP, I&C & Integration of Hybrid MW radio systems (Network Modernization).
-
Vodafone Greece: SWAP, I&C & Integration of BTS & LTE (VF SRAN).
-
WIND: LTE 4G, I&C & Integration of 4G LTEs 100 sites in Attiki.
-
VICTUS: Sharing Project BTS 2G/3G/4G LTE & MW Links in Greece.
-
OTE / COSMOTE: Packet Optical Transport Platform technology equipment installation, commissioning, and acceptance
-
VODAFONE,: IP/MPLS project OSN installation, commissioning, and acceptance.
-
WIND,: IP/MPLS project OSN installation, commissioning, and acceptance.
|
|
Hellenic Defence Industry
-
OTE: I&C of PtPSIAE Radio PtP
-
HELLENIC ARMY: Infrastructure, Installation & Alignment of Antennas (diam.3m)
Intracom Telecom
-
Vodafone & Karre:
Installation of WiBas Stations
|